[1.30 Bug] Discrepancy in listed build times


Rarely, I see in the selection of structures I can build (in the build menu of a city) the time listed for a structure as 2 turns, yet when I select that structure to build, it is, in the city build queue in the HUD, listed as taking 3 turns.

(Sadly, unlike in the Train menu, I cannot see the actual production value of the structure to test where the discrepancy might lie.)

2,734 views 3 replies
Reply #2 Top

Excuse me? Not sure I understand. If so, the production should be displayed identically in both register tabs.

Reply #3 Top

If production is carrying over, but the number of seasons required is just using the amount if it was at the front of the queue, it would be possible for later queued buildings of the same type to have a half or quarter wasted season or something like that, and so require an extra one.

This is my guess, that production is now carrying over but new building times are considered if they were at the front of the queue.  Either that or it is a bug.